EBAWE pallet circulation system with yellow lifting device and blue steel structure in front of curing chamber in precast plant EBAWE lifting beam for loading and unloading pallets in curing chamber system Yellow pallet circulation system with precast concrete element on steel pallet in front of curing chamber in precast plant EBAWE 20t lifting gantry with chain hoist in precast concrete plant – View of circulation system and curing chamber EBAWE Progress Group 20t lifting device in frontal view in front of curing chamber with blue formwork magnets on pallets

Freshly concreted elements must cure, before they can be transported to the warehouse or to the construction site. The most effective method of curing is in a pallet rack, which can be operated by a fully automatic pallet stacker.

Pallet stackers, equipped with the ebos® control system, allow the pallets to be fully automatically stored in and removed from a pallet rack.

EBAWE lifting beam with lattice girder element floor on pallet during transport to curing chamber

The pallets with the freshly concreted elements are stored in a pallet rack until the concrete is cured. This is achieved fully automatically by a pallet stacker controlled by ebos®. For optimum use of the hall space the pallets stacked in racks one above the other. The stacker lifts the pallets to the required bay and stacks and destacks the pallets.

Yellow EBAWE pallet lifter over circulation system with blue formwork magnets on orange pallet

Different pallet stackers are used to accommodate the design of the plant and the customer's individual requirements. If required, the pallet rack can be fitted with a heating system.

Stacking and destacking fully automated by ebos® 

Optimum use of the warehouse space

Computer-controlled curing ensures short processing times